Here you will find copies of our Preliminary Environmental Information Report (PEIR) and other detailed documents that we consulted on for our Statutory Consultation in 2021. Please note that only the PEIR and Outline Code of Construction Practice are included in our current targeted consultation on changes to our onshore cable route. Please got to our 2022 Consultation Page for the latest information at www.rampion2.com/consultation-2022
The Rampion 2 PEIR presents the draft findings of our Environmental Impact Assessments. The purpose of the PEIR is to enable stakeholders to develop an informed view of the likely significant effects of Rampion 2. Considering the findings, anyone with an interest can provide their feedback during the formal consultation, prior to the finalisation of proposals and submission of the consent application.
The PEIR includes 28 chapters with related figures (maps, graphs, diagrams etc) and appendices (further technical reports for reference). Each chapter is available below and presents the project and assessment of it’s potential impacts in-depth. Organisations such as Natural England, the Marine Management Organisation and others have a formal duty to respond to the consultation and will dive into the details. Anyone is welcome to take a look through of course.
A recommended starting point is the ‘Non-Technical Summary’.
If you are after less detail, then please visit our Formal Consultation page, which presents the key findings in easy to digest ‘factsheets’ and videos.
Formal Notifications which are legally required, and the Draft Development Consent Order are also available below.
Start with our interactive non-technical summary which introduces the PEIR Chapters and findings:
Click on the headings below to reveal the PEIR Chapters, and associated Figures and Appendices links.
Mapping and survey methods reports
Geophysical survey output charts etc.
Proposed development and SLVIA baseline etc. related Figures:
Figures 16.1 – 16.13, Volume 3, Chapter 16
Zone of Theoretical Visibility related Figures:
Viewpoint related Figures
Proposed development, baseline and zones of theoretical visibility etc. related Figures:
Viewpoint related Figures
To see a listing of all Figure & Appendix numbers and associated heading titles click below:
This presents a study of the potential implications of the Proposed Development on the integrity of 36 nature conservation sites to which the Habitats Regulations (2017) apply.
© 2023 Rampion 2 Wind Farm. All rights reserved.
Created with ❤ by Growth by Design